Skip to Content

23-lot subdivision planned for Brian Head

The final plat amendment was approved for the Crystal Aire Subdivision. The 23-lot subdivisionwill be located at Lightening Point with views ov Cedar Breaks National Monument and the town of Brian Head. The lots are .50 acres and larger. The development of the lot will be determined by the builder. Ridge Engineering is engineering the development.

Get E-mail Updates from

Receive FREE periodic updates from Subscribe here to be added to our mailing list.